      2. Environmental Contingency Home > BUSINESS > Environmental Contingency

        Environmental contingency plan, is an contingency plan that enterprises made in order to cope with all kinds of accidents, natural disasters, taking urgent measures to avoid or minimize the contamination to the plant boundary, air, water, soil and other environmental media.

         

        Environmental contingency plan can be divided into 3 parts:

         

        Environmental Risk Assessment, which is the analysis of the impact of all types of accidents and natural disasters, identification of environmental risk factors, and the analysis of the impact on neighboring residents, regional environment, determine the environmental risk level. Result: Environmental Risk Assessment Report.

         

        Contingency Resources Survey is survey of emergency resources that enterprises can call upon the first time, including the emergency response teams, equipments, materials, shelter and other emergency resources that may be requested for assistance. Result: Contingency Resources Survey.

         

        Environmental contingency plan, is the reasonable selecting, categorizing, determining of the contingency measurement and possible impact on nearby residents. The plan also includes the communications with environmental protection authorities and relevant departments. Result: Integrated environmental emergency plans, on-site disposal plans.

         

        Process of environmental emergency contingency plans for the record

         

         


        Baosteel zhanjiang preplan system diagram

        Case: The Environmental Contingency Plan project for Baosteel Zhanjiang Base

        Baosteel Zhanjiang base locatesin the northeast of Zhanjiang City, Guangdong Province, east of the island, with an area of 12.98km2. Baosteel Zhanjiang project involves seven immediate subordinate plant and 23 production processes, covering raw material field, sintering, coke, tar processing, crude benzene hydrogenation refining, iron, steel, continuous casting, hot rolling, heavy plate and cold rolled multi-process, as well as piers, limestone, dolomite roasting, oxygen, power plants, water desalination and other public auxiliary processes.